A new outdoor arena now replaces the open-air arena which previously existed west of the Horse Barn. The new arena and stalling barn are located on the east side of the Swine Barn. The majority of the construction was completed in time for the 2008 Iowa State Fair, allowing both the new arena the 188-stall barn to be used.
Final construction will include a covered walkway that will be along the north side of the outdoor arena.
To make room for the new buildings, the Feed and Ice Building was removed and a new Feed and Ice Building will be constructed south of Campgrounds - Gate 5.
 Construction progess on the covered walkway- May 2009 |  A covered walkway is being added, extending from the Stalling Barn to the Swine Barn. |
| |
 New outdoor arena |  Exterior of the stalling barn |
| |
 Interior of the stalling barn |
Check back for updates on our current Iowa State Fair renovation and preservation efforts, or call 1-800-450-3732 to find out how you can get involved.
To go back for more renovation information on other projects, click here.